TUESDAY 4TH
Well, he had to, didn't he....Tony hummed and harred about running network cable through the house, thought it would be better to do it now incase we needed it later, after all he had already bought the cable, so up again to the house we went, this time with Mia as we thought that the brickies would have finished for the day cos of the rain, but, no, they were still there along with the missing labourer. So, once again i sat in the car with the dog, but this time i bought along my book.....demister going, light on and music playing...i was quite comfy. Once the men left Mia and I ventured in....not long after we got inside the storm broke....surprisingly the estate wasn't that scarey out there alone with the thunder and lightening, neither was the house cold.
It didn't really take that long to do the network cable, the hard part was getting everything back into the car...by this time the storm had passed but the ground was very very muddy and slippery......the inside of the car now needs a thorough clean.
With all the work Tony has done inside the house over the last 4 days, there really isn't much to show for it as its all hidden.
Ducted vacuuming point
Brick work on the cnr of the rumpus room...not sure why every second row has no mortar in the end bricks
No comments:
Post a Comment