Thursday, July 22, 2010

What a busy bee....

Tony wanted to go out and check the distance between the wall lights in the theatre room.
Boy! there were cars every where at our place.
The tiler is still there, still waiting for the plumber to come, he was tiling the pantry when we got there and had finished around the edges of all the rooms now that the electrician has been, the entry way is nearly completed, while the ensuite is finished.
The painters were there in force, one was doing the cutting on the eaves, one was in the study doing a coat of stain on the window, and two were in the alfresco area starting work on the french doors there. The front door has had a coat of stain on it, it looks soooo different.
The base board in the garage has had another coat of paint as it now matches the door frames.
Our heating and air ducts are now in...hope they haven't finished cos there is nothing in the dining room which should have both heating and cooling.
Will have to check but the boys said that the return air vent has been put facing the family room, on the plan it is in the hallway which is where we preferred it.
As for the wall lights in the theatre room, they are too close together, yes, they are 2.5m apart but that is from the centre of each bayonet, won't be able to fit the screen in as it IS 2.5m wide.
Oh yeah, all our lights have little hats and globes in them, and they work...we were playing with the dimmers in the rumpus/theatre room......checked out the downlights above the sink area, yay, lottsa light to see with.
Was too busy looking at the tiles that i failed to notice that the inside of the door has also been stained


Cooling vent in the family room, notice the gorgeous light fitting...lol


so now we can keep warm


One of the floodlights

one of the external power points...as you can see the taps are yet to be finished

my beautiful front door which i forgot to add....silly me

No comments:

Post a Comment