Thursday, July 15, 2010

And more tiles.....

Adrian and I popped out to see if the tilers were working this afternoon.  Not only were they there working, they invited us in to have a look, the ensuite is nearly finished, there is only the shower base to be done which should be on saturday, the bathroom has the shower base and around the vanity to go. They have also done the floor in the toilet as well the laundry floor and splashback, the head tiler tells me that he has a few of the splashback tiles over and would i like them done over the second benchtop or above the splashback he's already done or would i like nothing at all.....Adee and I decieded to go with the second benchtop.
The Entranceway....all i can say is 'WOW!!!'......it has come up different to how i had pictured it, but boy have they done a good job on it, there is still a few of the borders around the edges to go in yet but it will be stunning.
The walkway from the entryway through to the rumpus room has been completed, they dining room is about 3/4's finished, the family room was about to be finished and they were starting on the kitchen wrap around.  We had been so worried about the brown tiles but need not...they have come up really well. The head tiler was explaining to us how they had been making sure that all the veins in the tiles all ran the same way, wouldn't have thought of that to be honest.....it was really nice to see someone who takes pride in his work, he was so excited when we turned up, pracitcally dragging us into have a look at the ensuite and then the bathroom.
We also saw that our utility benchtops are now back with the correct edging on them...yay.
ensuite

kelly's bathroom

laundry

entryway...half tiled

Family room...this is a level floor, not split level as it appears

Dining Room

from the rumpus room looking back towards the front door

No comments:

Post a Comment