Wednesday, February 17, 2010

Final Drawings

Our Final Drawings arrived today.....yay, we were super excited.
With the third soil test coming out in our favour, our site costs have been reduced as we now need no piers, however we did add some other items which took up most of the refund, but thats extra money we don't have to find.  :)

There were quite a few things that Porter Davis changed, for some reason they have decided that both my french doors should open inwards...hmmmm don't think so.  the extra power point we added to the ensuite for the heated towel rail, well they decided that it would work really well down beside the toilet and not near the shower where it was supposed to go...why you would want a power point next to the loo i do not know.
The other major thing we want cleared up is the extra air con vent....we wanted it in the kitchen area, well they sorta put it near the kitchen, they put it beside the bifold doors to the alfresco...so all the lovely cool air will go straight out the door and not cool me in the kitchen at all.

Anyway we now have an appointment with our CSC tomorrow to sort it all out.

No comments:

Post a Comment